Steel fabrication cost: the eight variables that set your price
Updated
Fabrication is priced from geometry, not from a description. Here is what a fabricator is actually adding up when they look at your drawing.
Why there is no price per kilo
Two parts of identical weight can differ in price by a factor of five. One is a flat plate with four holes. The other has tight tolerances, full penetration welds, a galvanised finish and a delivery to a site with no forklift.
Material is often the smaller half of a fabrication invoice, and everything else is time. So the useful question about steel fabrication cost is not what the steel costs, but how much time your drawing creates.
Where the money actually goes
- Material
- Priced by weight and grade, and it moves with the commodity market. Standard stock sizes are cheaper than anything that has to be ordered in, and offcuts you cannot use are still material you paid for.
- Processing
- Cutting, drilling, folding and rolling. Mostly machine time plus setup, which is why the first part is expensive and the tenth is not.
- Welding and fitting
- Usually the largest labour element. Weld length, access, position and whether the joint must be qualified and inspected all multiply it.
- Finishing
- Galvanising by weight, powder coating by area, painting by area and specification. Nearly always subcontracted, so it brings transport and a lead time with it.
- Delivery and installation
- Vehicle size, access, lifting equipment and how many people are needed on site.
What steel fabricators cost per hour and per tonne
Almost no UK fabricator publishes a rate; most quote per drawing. The few published figures we have read give a sense of scale:
- Mobile Welding London's price page (read 2 November 2026): £90 to £190 per hour for workshop welding labour, and £250 to £350 for a basic mobile job.
- MAK Structures' own cost page (read 2 November 2026), for structural work: around £2,500 to £4,500 per tonne for the supply and erection of structural steelwork.
- The same page: around £80 to £200 per square metre of floor area for the steel frame of a single-storey industrial or commercial building.
Treat these as one firm's published figures, not a market rate: your price comes from your drawing.
The three cheapest savings a buyer can make
- Loosen the tolerances that do not matter. Put a real tolerance on the dimensions that are functional and a general tolerance on everything else. This is usually the single biggest saving available and it costs nothing.
- Design to stock sizes. Standard plate thicknesses, standard sections and standard tube sizes are cheaper and quicker than anything that has to be specially ordered.
- Order a batch, or tell the fabricator a batch is coming. Setup and programming are amortised over quantity, so honest volume information changes the unit price more than haggling does.
What makes a quote come back slowly
- No drawings, or drawings without material and thickness on them.
- No finish specified, so the fabricator has to guess or ask.
- No quantity, so setup cannot be amortised sensibly.
- No delivery address or access information.
- "As cheap as possible" instead of a functional requirement. See what to send for a fabrication quote.
Structural steelwork is a different conversation
If the steel carries load in a building, you are into execution classes, welding procedure qualification and factory production control. The fabricator needs to be certified for it.
Construction products covered by a designated standard must carry the CE or UK (UKCA) marking to be placed on the Great Britain market. UKCA testing and certification go through a UK approved body (gov.uk).
The relevant standard for fabricated structural steel components is BS EN 1090. BS EN 1090-1 covers conformity assessment of structural components. BS EN 1090-2 covers execution of steel structures against an execution class, EXC1 to EXC4, which the designer specifies.
We name the standard rather than link it because it is published by BSI and is not a free web page. Ask any fabricator quoting structural work which execution class they are certified to, and check that it matches what your designer specified.
Do not take a structural specification from a website, including this one. The execution class, the welding requirements and the inspection level come from the design, and your engineer sets them.
Structural steel fabrication cost is moving fast
Structural steel fabrication cost has risen faster than most building materials. BCIS, reporting Department for Business and Trade data (read 12 October 2026) show prices for fabricated structural steel up 17.7% in the 12 months to June 2026. Over the 12 months to August 2026 the rise was 21.2%.
The ONS producer price inflation bulletin puts the rise in the price of metals and non-metallic mineral inputs at 4.2% in the year to February 2026. That is why a structural quote carries a short validity on the material element.
How fabrication estimating works
Fabrication estimating is a take-off, not a rate card. The estimator lists every part from your drawing and prices the material by weight and grade. Then they add the cutting, forming, welding and fitting time each part needs, the finish and the delivery.
For structural work they add the inspection and paperwork the execution class requires. The setup is counted once and spread over the quantity. That is why a drawing with material, thickness, tolerances and finish on it gets a firm price, and a description gets a guess.